This manual covers the WNS and CWNS families of three-pass, wet-back fire-tube boilers: packaged oil and gas fired units from 0.5 to 20 t/h saturated steam at 1.0, 1.25 and 1.6 MPa, plus CWNS hot-water variants from 0.7 to 14 MW. It is written for boiler-house operators, shift supervisors and maintenance technicians responsible for safe running, scheduled inspection and annual shutdown. It assumes installation to section 2 and commissioning to section 4.

Document code YX-MAN-WNSRevision 1.0Issue date 2026-11Applies to WNS0.5-1.0 to WNS20-1.6; CWNS0.7-14Language English

1. Scope and model coverage

The WNS range is a three-pass fire-tube boiler with a corrugated furnace, wet-back reversal chamber and threaded smoke tubes. Burner, feed pump, panel and safety accessories are mounted on a common base frame before dispatch, so site work is limited to services, flue connection and commissioning. CWNS units share the same pressure parts but deliver 95/70 °C hot water and carry no low-water safety chain. The WNS steam models and CWNS hot-water units are listed below; the oil and gas boiler range page gives drawings for each size.

Model Capacity Design pressure / temperature Fuel Typical duty
WNS0.5-1.0, WNS1-1.0 0.5–1.0 t/h (0.35–0.7 MW) 1.0 MPa, 184 °C saturated Natural gas, LPG, light oil Laundries, small food plants, standby steam
WNS2-1.25, WNS4-1.25 2–4 t/h (1.4–2.8 MW) 1.25 MPa, 194 °C saturated Natural gas, light oil Food processing, greenhouses, hotels
WNS6-1.6, WNS10-1.6 6–10 t/h (4.2–7.0 MW) 1.6 MPa, 204 °C saturated Natural gas, light oil, heavy oil on request Dairy, paper converting, district steam
WNS15-1.6, WNS20-1.6 15–20 t/h (10.5–14 MW) 1.6 MPa, 204 °C saturated Natural gas, light oil Chemical plants, large laundries, hospitals
CWNS0.7-14, CWNS1.4-14 0.7–1.4 MW 1.0 MPa, 95/70 °C Natural gas, light oil Small heating networks, pools
CWNS2.8-14 to CWNS14-14 2.8–14 MW 1.0 or 1.25 MPa, 95/70 °C Natural gas, light oil District heating, large HVAC plants

Excluded: site electrical work beyond the burner and panel terminal boxes, structural steel, chimney design, fuel storage tanks and the buried blowdown line. Capacity margin and standby policy are discussed under capacity selection. Model drawings, nozzle schedules and the burner OEM manual ship with the pressure-part file.

2. Site and utility requirements before delivery

Confirm every item before the boiler enters the building. Most delays on packaged units come from a foundation at the wrong height, an unreachable flue connection, or a gas supply sized for the old boiler. Tube-removal clearance is most often missed: both doors must open fully and the smoke tubes must withdraw straight.

Item Requirement Tolerance / notes
Foundation Reinforced concrete plinth, level, capable of carrying wet weight plus 25 % Level within 3 mm per metre; grout after alignment
Clearances 1.2 m at front door, 0.8 m at rear door, 1.0 m at sides, 1.5 m above casing for access Tube withdrawal needs clear length equal to boiler shell plus 1 m
Boiler-house ventilation Low-level inlet and high-level outlet sized for combustion air plus 10 % casing loss Inlet velocity below 5 m/s; no recirculation of flue gas
Feed water Softened make-up, hardness ≤ 0.03 mmol/L, clear and free of oil Deaerator required above 6 t/h; feed temperature 104 °C after deaeration
Boiler water pH 10–12, conductivity per GB/T 1576 for the drum pressure Typically ≤ 4 000 µS/cm at 1.6 MPa; dissolved oxygen ≤ 0.05 mg/L
Fuel gas Pressure and flow per burner data plate, typically 20–50 kPa for natural gas Stable within ±10 %; regulator and filter upstream of the gas train
Light oil 1.5–2.0 MPa at the burner inlet, 10–40 °C, filtered to 25 µm Day tank above pump suction; water and sediment drained weekly
Flue and chimney −20 to −50 Pa at boiler outlet at high fire; flue tight to 1.5 kPa Sized for 92–95 % efficiency at rated load
Electrical supply 400 V, 3-phase, 50 Hz, separate isolator at the boiler Earth resistance ≤ 4 Ω; neutral and earth separated at panel
Drainage and blowdown pit Blowdown pit with cooling, discharge to drain at ≤ 60 °C Pit volume for two full blowdowns; vented cover

3. Installation sequence

The sequence assumes the plinth has cured and the boiler house is weather-tight. Do not shorten the pressure test or flue checks to gain schedule.

  1. Unload on the marked base-frame lugs only. Keep the unit level and never sling on the burner, panel or shell nozzles. Acceptance: no cladding deformation, no damaged lugs.
  2. Set the boiler on the plinth and align to the drawings. Acceptance: level within 3 mm per metre in both directions, base fully supported.
  3. Grout under the base frame and allow the cure time before filling. Acceptance: no voids under the frame when tapped.
  4. Fit the feed-water and steam connections with the specified gaskets. Acceptance: flanges parallel, bolts torqued in crossing pattern.
  5. Install feed pump, softener and deaerator where fitted, then run the pump against a closed valve to set the relief bypass. Acceptance: suction head per data sheet, discharge 0.2–0.3 MPa above drum pressure.
  6. Connect the blowdown line to the pit through the cooler. Acceptance: continuous fall, no low point that can hold water.
  7. Erect flue and chimney, then check draught with a manometer before firing. Acceptance: −20 to −50 Pa at the boiler outlet with the fan running.
  8. Wire burner, panel, feed pump and safety devices to the terminal boxes. Acceptance: insulation resistance ≥ 1 MΩ at 500 V.
  9. Prove the gas train with air or nitrogen at 1.5 times working pressure. Acceptance: no decay over 10 minutes, soap test on every joint.
  10. Fill with treated water through the economiser where fitted, venting at the highest point. Acceptance: level in the glass, all air released.
  11. Check burner swing clearance and door gasket compression. Acceptance: door closes by hand, no gap at the seal.
  12. Check that the burner servo and air damper stroke freely through the full range. Acceptance: no binding, position feedback agrees within 2 %.
  13. Hydrostatic test at 1.5 times design pressure for 30 minutes. Acceptance: no pressure drop, no weeping at seams, stays or tube ends.
Lifting and riggingUse only the certified points on the base frame. A WNS20-1.6 weighs about 42 t dry; never lift by shell lugs, burner flange or panel frame. Keep clear of the swing radius and never work under a suspended load.
Expansion and anchorageThe shell grows 6–10 mm between cold and operating temperature. Fix one end only and let the other slide on stainless pads, or fit the flue expansion joint. Never weld the flue to both the boiler outlet and a rigid chimney without a compensator.

4. Commissioning and handover

Commissioning starts after the hydrostatic test and internal inspection. Fill slowly with softened water, vent all high points, and check that the low-water cut-out and gauge glass agree before firing. Avoid fill water below 20 °C in winter; it can shock the tube plates.

The hydrostatic test is 1.5 times design pressure: 1.5 MPa for a 1.0 MPa boiler, 1.875 MPa for 1.25 MPa and 2.4 MPa for 1.6 MPa. Hold 30 minutes with a calibrated gauge, inspect every seam, stay and tube end, then drain and dry the furnace. This follows GB/T 16508 and TSG G0001 practice; third-party inspection is available on request. Blank the safety valve during the test and refit it afterwards. Safety valves are set at or below design pressure with accumulation not above 10 %, following ISO 4126 practice.

Burner set-up follows the OEM curve. At high fire on natural gas, set O₂ to 3.0–5.0 % dry, CO₂ to 9.5–11.0 %, and CO below 50 ppm. Stack temperature should settle at 150–180 °C with an economiser or 200–240 °C without. Record low, medium and high fire; these figures become the fouling baseline in section 6. The burner range page lists gas train options.

Interlock Simulated condition Expected result
Low water cut-out Drain the float chamber with the burner at low fire Burner stops within 5 s, lockout and alarm, no restart until level restored and reset
High steam pressure Lower the set point below running pressure Burner stops at set point, restarts at reset differential
Flame failure Close the manual gas cock during firing Flame scanner sees loss, gas valves close within 3 s, lockout
Gas low pressure Throttle the gas supply below the switch setting Burner stops before flame instability, lockout and alarm
Combustion air proving Stop the forced-draught fan or trip the air switch Gas valves close immediately, no ignition permitted
High stack temperature Lower the limit to below the running value Alarm first, then burner trip at the upper limit
Feed pump failure Stop the pump with the burner running Level falls to the cut-out, burner stops, alarm raised

After the interlocks pass, run 4 hours at rated load and log pressure, level, stack and flue analysis every 30 minutes. Then run 24 hours covering 50–100 % load swings and three automatic start-stop cycles. Handover documents: pressure-part and material certificates, hydrostatic record, safety valve certificates, burner manual, wiring diagrams, PLC backup, interlock sheets and this manual with the serial number entered.

5. Normal operation

The large water volume lets a WNS respond quickly, but the furnace and tube plates do not tolerate fast temperature change. Warm through at low fire for at least 20 minutes, and never raise pressure faster than 0.1 MPa per minute.

Start-up from cold. Check the level and confirm feed and blowdown valves are set for operation. Open the air vent and start the feed pump to mid-glass. Run the fan for a pre-purge of at least 60 seconds at 25 % air, then light the burner at low fire. Hold low fire until the shell is warm and stack temperature has stabilised, then raise in steps with the servo gas train while watching flame and level. Close the vent at 0.05 MPa.

Start-up from hot standby. Keep the boiler at 0.3–0.5 MPa on low fire, or use the standby pressure control if fitted. Before returning to service, blow down the gauge glasses, confirm both agree, and compare stack temperature with the last log. If idle under pressure for more than 24 hours, test the low-water cut-out before firing.

Running log. Record the following at least every two hours, and every hour during load changes; the touch panel trend screens hold 30 days of history.

Parameter Normal band Action if outside
Steam pressure Set point ± 0.05 MPa Check burner modulation and pressure transmitter
Water level Middle third of gauge glass Check pump, control valve and level electrodes
Feed water temperature 20–30 °C cold, 102–105 °C deaerated Check deaerator pressure and vent
Stack temperature Baseline ± 10 °C at same load Rise above 30 °C indicates fouling; plan cleaning
Flue O₂ / CO₂ O₂ 3–5 %, CO₂ 9.5–11 % (gas) Re-trim burner air damper
Feed pump discharge 0.2–0.3 MPa above drum pressure Check suction strainer and impeller wear

Normal shutdown. Reduce to low fire, stop the burner and let the fan purge the furnace for 3–5 minutes. Close the main steam stop and feed valves. Leave the boiler full and under pressure if restarting within 24 hours; otherwise follow the lay-up procedure.

Emergency shutdown. Press the emergency stop, closing the gas valves and stopping burner and fan. Close the main gas cock by hand. Do not open the furnace doors until the boiler is below 60 °C and purged. Find the trip cause before resetting.

Lay-up over 30 days. For wet lay-up, fill to the top of the gauge glass with water at pH 10–12 dosed with an oxygen scavenger, and hold 0.1–0.2 MPa of nitrogen. For dry lay-up, drain, dry the interior with warm air, place trays of quicklime or silica gel in furnace and shell, and seal all openings. Inspect monthly and renew spent desiccant.

6. Maintenance schedule

Intervals assume continuous duty on treated water and clean gas. Shorten them for hard raw water, heavy oil, or above 80 % load for more than 16 hours a day. A task is complete only when its acceptance value is recorded.

6.1 Daily (each shift)

Task What to check / acceptance Tool or reference Who
Blow down both gauge glasses Water returns quickly, glasses agree within 5 mm, no weep at glands Gauge glass procedure Shift operator
Check feed pump running Discharge 0.2–0.3 MPa above drum pressure; seal dry, no drip Pump data sheet Shift operator
Observe flame and scanner signal Stable flame, no lift, scanner signal steady, no flicker alarm Sight glass, PLC trend Shift operator
Log stack temperature Within 10 °C of baseline at the same load Flue thermometer Shift operator
Check fuel supply pressure Within the burner data-plate band, ±10 %; no gas smell or oil leak Gas/oil pressure gauges Shift operator
Surface blowdown by conductivity Conductivity within the GB/T 1576 limit after blowdown Conductivity meter Shift operator
Test softened water hardness Outlet hardness ≤ 0.03 mmol/L EDTA titration kit Water chemist

6.2 Monthly

Task What to check / acceptance Tool or reference Who
Low-water cut-out test Drain the float chamber; burner trips before the glass empties; refill and reset Interlock test sheet Maintenance technician
Manual lift of safety valve Valve opens and reseats, no wire drawing or leakage; record set pressure Lifting lever, valve log Shift supervisor, witnessed
Clean flame scanner and photo-cell Lens clean, signal within OEM range, no soot on the sight tube Soft cloth, isopropyl alcohol Burner technician
Clean ignition electrodes and set gap Gap 2.5–4.0 mm per burner OEM; insulator free of carbon tracking Feeler gauge, OEM manual Burner technician
Check modulating level control Level stable within ±10 mm at steady load; pump cycles not excessive Trend screen, level transmitter Instrument technician
Burner valve proving test Automatic proving sequence passes with no pressure decay in the test period Burner OEM procedure Gas engineer
Full water chemistry panel Hardness, alkalinity, pH 10–12, conductivity and dissolved O₂ ≤ 0.05 mg/L all in limit Laboratory analysis Water chemist
Flue gas analysis at high fire O₂ 3–5 %, CO ≤ 50 ppm, CO₂ 9.5–11 % on natural gas Combustion analyser Burner technician

6.3 Quarterly / semi-annual

Task What to check / acceptance Tool or reference Who
Strip and clean burner head Diffuser and swirler clear, nozzle or gas ports clean, electrodes reset; combustion re-trimmed to O₂ 3–5 % OEM kit, analyser Burner technician
Check pump and fan bearings Vibration ≤ 4.5 mm/s RMS; grease per OEM interval; no abnormal noise Vibration meter, grease gun Maintenance fitter
Full interlock functional test Each of the seven interlocks in section 4 trips and locks out as specified Interlock test sheet Instrument technician
Overhaul gauge glasses and try-cocks Glasses clear, gaskets renewed, both glasses agree within 5 mm, no weep Gauge glass set, spanner Maintenance fitter
Inspect blowdown and check valves Seats tight, no passing when closed, check valve holds against backflow Visual, pressure test Maintenance fitter
Clean economiser and check bypass Fins clear, flue gas outlet temperature back within 15 °C of baseline, damper strokes fully Water jet, temperature gauge Service crew
Thermal survey of casing Surface ≤ 60 °C at 1 m height in access areas; no hotspot above 80 °C Infrared thermometer Maintenance engineer

6.4 Annual shutdown inspection

Task What to check / acceptance Tool or reference Who
Internal inspection of pressure parts No cracks at tube plates or wet-back; wall thickness at 12 furnace points within drawing minimum Borescope, ultrasonic gauge Inspector, third party
Brush and wash fire tubes and smoke tubes All tubes clear, scale below 0.5 mm, baffles and turbulators intact Tube brush, high-pressure water Service crew
Inspect refractory and wet-back Cracks below 3 mm, no spalling, burner throat sound; cure per schedule after repair Crack gauge, visual Refractory technician
Overhaul and bench-test safety valves Set pressure ≤ design pressure within ±3 %; accumulation ≤ 10 %; certificate issued Valve shop, test bench Authorised valve shop
Hydrostatic test after major repair 1.5 × design pressure held 30 min, no drop, no weeping Test pump, calibrated gauge Inspector
Burner annual overhaul Gaskets, nozzle, photo-cell and gas valve seats renewed; combustion re-commissioned OEM annual kit Burner technician
Feed pump overhaul Mechanical seal renewed, coupling alignment ≤ 0.05 mm, no leak at run Pump OEM manual, dial gauge Maintenance fitter
Calibrate instruments and back up PLC Pressure and temperature loops within ±1 % of span; program archived off-site Calibrator, laptop Instrument technician
Clean flue and measure draught Draught −20 to −50 Pa at outlet at high fire; no leakage at flue joints Manometer, smoke test Service crew
RecordsKeep log sheets, chemistry results, interlock tests and inspection reports for three years, or for the life of the boiler where the pressure-part file requires it. Any anomaly repeating twice in a month, or a stack rise above 30 °C, goes to the maintenance engineer in writing the same shift.

7. Troubleshooting

Work through the checks in order and record what changed before the fault. Most lockouts trace back to water level, flame signal or fuel pressure, not the PLC.

Symptom Likely cause Check Remedy
Burner locks out on start Electrode gap wrong, photo-cell dirty, gas pressure low Gap 2.5–4.0 mm, lens, gas gauge at train Reset gap, clean cell, restore gas pressure
Flame failure during run Water in oil, flame lift, scanner vibration Oil day tank drain, flame shape, scanner mount Drain water, re-trim air, reseat scanner
Steam pressure below set point Fouled tubes, burner stuck at low fire, gas pressure low Stack temperature, servo position, supply pressure Clean tubes, free actuator, raise supply pressure
Stack temperature high Scale on tubes, excess air, economiser fouled Compare with baseline at same load; flue O₂ Brush tubes, trim air, clean economiser
Low water alarm with normal glass Float chamber blocked, electrode fouled, wiring fault Blow down chamber, inspect electrode, check continuity Clean chamber and electrode, repair wiring
Priming or foaming High conductivity or alkalinity, oil contamination, level too high Chemistry panel, gauge glass level Blow down, dose, find oil source
Water hammer in feed line Check valve passing, air in line, pump cavitation Check valve seat, vent, suction strainer Replace check valve, vent line, clean strainer
Feed pump noisy or leaking Low suction head, worn seal, misalignment Suction pressure, seal face, alignment Raise tank, renew seal, realign to 0.05 mm

8. Spare parts and service

Hold these first-year spares on site. Critical items stop the boiler if they fail; factory lead time is four to six weeks.

Item Recommended quantity Note
Gauge glass set with gaskets 2 sets Critical; one set per glass
Level electrode or float switch 1 Critical, match panel input
Flame scanner / photo-cell 1 Critical
Ignition electrodes and leads 1 set Set gap before fitting
Oil nozzle or gas orifice set 1 set Size per commissioning record
Burner gasket and seal kit 1 Renew at every strip-down
Feed pump mechanical seal 1 Match pump model
Pressure gauge, 0–2.5 MPa 2 Calibrated, with siphon
Safety valve spare 1 Bench-set before fitting

Consumables: gauge glass tube, softener resin, hardness and alkalinity reagents, oxygen scavenger, burner filter elements and gasket sheet. Order by model, serial number and drawing number; the serial plate sits on the front tube plate below the burner. The manual library holds the current revision and wiring drawings.

Service contactHenan Yongxing Special Equipment Co., Ltd. responds to a boiler-down call within 24 hours and to a scheduled service request within five working days. Have the serial number, the last log sheet and the PLC alarm history ready when you call. Annual shutdown inspections can be booked with third-party inspection included.

9. Document control

Each revision is hash-verified: the SHA-256 and file size are published on the verification page, so you can confirm that a downloaded copy is unaltered.

Rev Date Change
A 2024-03-15 First issue for WNS0.5 to WNS20 and CWNS0.7-14.
B 2025-06-02 Added CWNS 1.25 MPa variants, economiser checks, revised interlock table.
1.0 2026-11 Current issue. Maintenance intervals aligned with GB/T 16508 and TSG G0001 practice.

Compare the SHA-256 of your copy with the value at the verification page. If they differ, discard the file. The pressure-part file and safety valve certificates are controlled separately.

This manual covers the family as a whole. For the site version with your model, serial number, nozzle schedule and burner settings, send the serial and drawing number through the contact form.

Request the site-specific manual

Document control and download

Document

YX-MAN-WNS · revision 1.0 · issued 2026-11
Applies to the model families listed in section 1.

Download

Manual PDF · 236 KB
Print-ready A4, same content as this page.
Weekly maintenance log sheet · one page for the shift file.

SHA-256 9c0b665885065a2c0857b74529f1c55c66ba4c38bb6a56b30e1cdb30ed621da7

This fingerprint is calculated from the PDF file itself. Verify it on the verification page — the check runs in your browser, so an altered file cannot pass. A signed copy of the full manifest is published alongside it.

Key facts

  • YXBOILER is the global brand and manufacturing site of Henan Yongxing Boiler Manufacturing Co., Ltd., an industrial boiler and pressure-vessel manufacturer founded in 1981 in Henan, China.
  • Main products: steam boilers, hot-water boilers, thermal-oil heaters, biomass and coal-fired boilers, electric boilers, pressure vessels and autoclaves.
  • Serving customers in worldwide with selection, drawings, export packaging, installation guidance and spare parts.
  • Contact: WhatsApp +86 133 5377 2661 · [email protected].

Related on this site

Specifications, categories and further reading.

YXBOILER network

The same manufacturer, documented site by site.

Standards & references

Independent sources used in our engineering work.

YXBOILER — Global brand and manufacturing site. Last updated November 2026.

Написать в WhatsApp
WhatsApp Email Запрос