This manual covers installation, commissioning, operation and maintenance of the LRF vertical biomass hot air furnace, the ZRFQ direct-fired oil and gas hot air generator and the WRF clean-air heater. It applies to units from 0.12 MW to 11.6 MW (100,000 to 10,000,000 kcal/h) with outlet air at 120–350 °C. It is written for the site engineer, the commissioning technician and the maintenance team who take over the ductwork, burner, controls and refractory after handover.
1. Scope and model coverage
The family has three architectures: LRF, a vertical biomass furnace with a refractory combustion chamber and horizontal air-to-air exchanger; ZRFQ, direct-fired with the burner firing into the air stream; WRF, an indirect clean-air heater with a stainless exchanger and HEPA final filtration, so flue gas and process air never mix. The range is in the capacity selection guide.
| Model | Capacity | Outlet air | Fuel | Typical duty |
|---|---|---|---|---|
| LRF-15 | 0.17 MW · 150,000 kcal/h | 120–300 °C | Wood chip, pellet, rice husk | Grain and timber drying |
| LRF-60 | 0.70 MW · 600,000 kcal/h | 150–350 °C | Biomass, moisture ≤ 25% | Brick and tile tunnel dryer |
| LRF-120 | 1.40 MW · 1,200,000 kcal/h | 150–350 °C | Biomass, moisture ≤ 25% | Spray dryer process air |
| ZRFQ-30 | 0.35 MW · 300,000 kcal/h | 150–350 °C | Natural gas, LPG, diesel | Direct food and feed drying |
| ZRFQ-240 | 2.80 MW · 2,400,000 kcal/h | 150–350 °C | Natural gas, LPG, diesel | Sand, mineral and aggregate drying |
| ZRFQ-600 | 7.00 MW · 6,000,000 kcal/h | 200–350 °C | Natural gas, heavy oil | Large tunnel and kiln air supply |
| WRF-20 | 0.23 MW · 200,000 kcal/h | 120–250 °C | Gas or oil, indirect | Pharmaceutical clean air |
| WRF-100 | 1.16 MW · 1,000,000 kcal/h | 120–250 °C | Gas or oil, indirect | Food spray drying, HEPA air |
Each unit is designed and built to GB/T 16508 and TSG G0001 where pressure parts are present; third-party inspection on request. Excluded: ductwork downstream of the outlet flange unless ordered, site electrical work beyond the terminal box, gas piping and fuel storage upstream of the inlet flange, and third-party duct insulation. Drawings, the product pages for LRF, ZRFQ and WRF, and the manual library govern where they are more specific.
2. Site and utility requirements before delivery
Confirm every item below before the unit leaves the works; a missing utility delays start-up, and a duct route never checked against the fan curve cannot be fixed on site without new ductwork.
| Item | Requirement | Tolerance / notes |
|---|---|---|
| Foundation / plinth | Reinforced concrete, level, cured 28 days, mass ≥ 1.5 × unit mass | Level ±3 mm over the base frame; grout after alignment |
| Clearances — exchanger side | Free length ≥ 1.2 × tube bundle length | Bundle withdrawal for cleaning and re-tubing |
| Clearances — burner side | 1.5 m swing clearance, 0.8 m access all round | ZRFQ and WRF burner door opening |
| Combustion air | Clean, 1.2 × stoichiometric demand, 20 °C design | Duct from outside if the room exceeds 35 °C |
| Dilution air | Filtered, 20–35% of total outlet flow at full turn-down | Take from a clean zone, not from the dryer return |
| Fuel gas | 20–50 kPa at the inlet flange, steady supply, calorific value per contract | Regulator and filter by others upstream |
| Fuel oil | Diesel 0.5–2.0 MPa at the burner; heavy oil preheated to 90–110 °C | Ring main with return, filter 40 µm |
| Biomass fuel | Chip or pellet 5–30 mm, moisture 8–25%, ash ≤ 5% | Fines below 3 mm ≤ 15%; no stone or metal |
| Electrical supply | 380 V ±5%, 3-phase, 50 Hz; neutral and earth at the terminal box | Voltage unbalance ≤ 2%; separate isolator per motor |
| Earthing | Earth resistance ≤ 4 Ω, bonding of casing, duct and burner | Test certificate before energising |
| Flue and chimney | Draught −20 to −60 Pa at the flue outlet; height per drawing | No shared chimney without a draught stabiliser |
| Drainage | Floor drain at the ash pit and condensate point | Slope 1:100 to the pit |
A standard unit has no feed water circuit, so hardness, pH and oxygen limits do not apply. Where an optional evaporative tempering chamber is fitted, use softened water at hardness ≤ 0.03 mmol/L and pH 8.5–9.5; above 6 t/h equivalent on that circuit, add a deaerator.
Provide three air changes per hour at full rate and keep the combustion air inlet below 35 °C. Brace the flue independently of the casing. Measure draught at minimum and maximum firing rate: a flue sized for full rate can over-draught at low rate and lift the flame off the diffuser.
3. Installation sequence
- Check the delivery against the packing list: casing, exchanger bundle, burner, cabinet, refractory and duct flanges. Photograph any damage before signing.
- Set the unit on its plinth on the marked lifting lugs only, grout the base frame and check level to ±3 mm. Acceptance: no rocking, anchor bolts finger-tight before grouting.
- Install flue and chimney on their own support. Acceptance: flue moves 2 mm by hand at the joint, no load on the casing.
- Erect the supply duct from the outlet flange back towards the dryer, supported at 2.5 m centres with sliding shoes at expansion joints. Acceptance: duct moves no more than 3 mm when pushed by hand.
- Fit the dilution damper and actuator; the damper must fail open on power loss. Acceptance: 90 s full stroke to both stops without binding.
- Install the outlet sensor 1.0 m from the outlet flange at duct centre, and the high-limit capillary 0.5 m upstream of the first branch. Acceptance: probe at marked depth, pocket filled with heat-transfer paste.
- Connect the gas train or oil line to the burner inlet with filter, regulator, pressure switches and two safety shut-off valves in drawing order. Acceptance: all joints soap-tested at 1.5 × working pressure.
- For LRF, erect hopper, feed screw and ash conveyor, set the grate and check the ash door seal. Acceptance: screw turns freely by hand, gasket compresses evenly.
- Cast the combustion chamber refractory to the drawing, keeping expansion joints free of castable. Acceptance: anchors fully embedded, 3 mm fibre joints open, no bridging.
- Wire the cabinet to the terminal box and check motor rotation with couplings removed. Acceptance: correct rotation, no rubbing, no-load current within nameplate.
- Fit the airflow proving switch with tappings five diameters apart. Acceptance: switch changes state at 70% of design differential pressure.
- Insulate the duct in two staggered layers and clad, then pressure-test at 1.5 × working static for 30 minutes. Acceptance: no gap above 2 mm, leakage ≤ 2% of design flow.
- Run the fan 30 minutes and record vibration and bearing temperature. Acceptance: ≤ 4.5 mm/s RMS, bearing rise ≤ 40 K.
Ductwork and static pressure budget. Size the main duct for 10–14 m/s, branches for 6–8 m/s. Compute the budget with the duct and static pressure calculator before ordering the fan; the example is a ZRFQ-240 at 2.8 MW and 48,000 m³/h.
| Component | Design loss (Pa) | Note |
|---|---|---|
| Heater casing and exchanger | 250 | Clean bundle, from the fan curve |
| Burner combustion head | 80 | ZRFQ only; zero for WRF |
| Supply duct, 40 m at 12 m/s | 320 | 0.8 Pa/m at 300 °C |
| Fittings, bends and transitions | 90 | 15% of straight-run loss |
| Balancing dampers, two | 100 | Half-closed allowance |
| Final filter bank F9, dirty | 220 | Change filters at 350 Pa |
| Outlet plenum and louvres | 60 | Fixed loss |
| Design margin 15% | 168 | Applied to the subtotal |
| Fan external static, selected | 1,500 | 1,288 Pa calculated, 10% flow margin |
4. Commissioning and handover
There is no water-side pressure part on a standard unit, so test the air casing and duct instead: 1.5 × 6 kPa casing design pressure, 9 kPa, held 30 minutes, then soap-test every flange and sight glass. An optional water coil is hydro-tested at 1.5 × design pressure for 30 minutes.
Dry out new refractory before any fired run: hold 150 °C for 6 hours, raise at 25 K/h to 600 °C, hold 4 hours, with the chamber open to atmosphere. A faster dry-out cracks the castable and voids the refractory warranty. Then clean the tubes, close the doors and check the flame pattern at minimum rate.
Set the burner on the contracted fuel: 3.5–5.0% O2 for gas, 4.0–6.0% for oil, 6.0–9.0% for biomass, CO below 50 ppm at the stack. Tune the outlet loop for 60 s settling and under 5 °C overshoot after a 10% damper step. Record fan current, casing surface temperature and outlet static pressure as the baseline.
| Interlock | Simulated condition | Expected result |
|---|---|---|
| High-limit thermostat | Heat the outlet sensor to setpoint + 20 °C | Burner trips, alarm shows, dilution damper drives open |
| Airflow proving switch | Stop the supply fan, or close the main damper | Fuel valves close within 5 s, lockout, no restart without reset |
| Purge incomplete | Interrupt the purge timer at 50% | No ignition; controller returns to purge |
| Gas low pressure | Reduce inlet to 70% of set pressure | Lockout within 3 s, alarm |
| Gas high pressure | Raise inlet to 110% of set pressure | Lockout, both shut-off valves close |
| Flame failure | Close the manual cock during firing | Shutdown within 3 s flame-failure response time |
| Emergency stop | Press the E-stop | All fuel valves close; fan runs on for 3 min to cool the casing |
| CO monitor, direct-fired | Inject test gas to 100 ppm in the outlet duct | Alarm at 50 ppm, trip at 100 ppm |
Run 4 hours at 50% and 100% load, then 24 hours at the duty point. Log hourly: outlet temperature, damper position, O2, stack temperature, fan current, bearing temperature, vibration and refractory skin temperature. Handover documents: this manual, as-built drawings, wiring diagram, burner data sheet, dry-out record, interlock test sheet, fan balance report, duct leakage test sheet and the signed 24-hour record.
5. Normal operation
Start-up from cold. Check the ash pit is empty and the hopper holds four hours of fuel. Open the fuel manual valve, confirm gas pressure in band, start the supply fan and wait for airflow proof. Purge five chamber volumes, never less than 30 s at full airflow. Light at minimum rate, hold two minutes, then release to modulating control. On LRF, run the feed screw slowly until the fire establishes.
Start-up from hot standby. Keep the fan at 30% flow and the outlet at 150 °C. Before resuming, confirm the refractory skin is above 200 °C, check the scanner is clean and purge 30 s. A hot start skips warm-up but never skips the purge.
| Parameter | Normal band | Action if outside |
|---|---|---|
| Outlet air temperature | Setpoint ± 5 °C | Check damper position and sensor |
| Dilution damper | 20–80% open at duty | Below 15% means the unit is at its limit |
| Combustion O2 | Gas 3.5–5.0%, biomass 6.0–9.0% | Trim air damper; check for casing leaks |
| Stack temperature | Gas 180–220 °C, biomass 160–200 °C | Rise above 250 °C means fouling |
| Casing surface temperature | ≤ 60 °C at 300 °C air | Repair insulation or cladding |
| Fan current | ≤ nameplate, steady | Check filter loading and belt slip |
| Bearing temperature | ≤ 80 °C, rise ≤ 40 K | Grease, then investigate alignment |
| Vibration velocity | ≤ 4.5 mm/s RMS | Clean and rebalance the impeller |
| Filter differential pressure | 80–350 Pa | Change at 350 Pa |
Normal shutdown. Reduce to minimum rate, hold three minutes to burn off the grate, stop the burner and run the fan ten minutes to cool the casing. Close the fuel manual valve, stop the fan, close the dilution damper, and on LRF run the ash conveyor empty.
Emergency shutdown. Press the E-stop: fuel valves close and the fan continues three minutes. Do not open the chamber door above 200 °C, and do not restart before the cause is found and the chamber purged. For a flue fire, close the fuel, keep the fan running and never use water on the refractory.
Lay-up over 30 days. A standard unit has no water side. Dry lay-up is the default: clean ash and soot, dry the refractory with a 150 °C hold for four hours, close doors and flue dampers, and place 5 kg of desiccant per cubic metre of casing volume; replace saturated desiccant monthly. For an optional tempering chamber, drain and apply wet lay-up with a nitrogen blanket or 200 ppm inhibitor.
6. Maintenance schedule
The tables are the minimum. Severe duty — high-ash biomass, or a food dryer running 24 hours — halves every interval. Keep the energy consumption figures with the log so drift in stack temperature or fan current shows against the baseline.
6.1 Daily (each shift)
| Task | What to check / acceptance | Tool or reference | Who |
|---|---|---|---|
| Record outlet temperature and damper position | Setpoint ± 5 °C; damper 20–80% at duty | HMI trend, shift log | Operator |
| Read O2 and stack temperature | O2 in band; stack within 20 °C of baseline | Flue gas analyser, once per shift | Operator |
| Check flame signal and flame colour | Stable signal above the controller minimum; no yellow tips | Sight port, HMI | Operator |
| Check fuel pressure at the train | Within 20–50 kPa gas; oil pressure per burner sheet | Pressure gauge | Operator |
| Empty ash pit, check ash bin seal (LRF) | Pit below the grate line; no air leak at the door | Visual, hand test | Operator |
| Feel fan for vibration and heat | No new noise; bearing housing below 80 °C | Hand, infrared thermometer | Operator |
| Inspect refractory through the port (LRF) | No glowing cracks or fallen pieces | Visual at low rate | Operator |
6.2 Monthly
| Task | What to check / acceptance | Tool or reference | Who |
|---|---|---|---|
| Clean or replace intake and process filters | Final differential pressure ≤ 120 Pa clean; no torn media | Vacuum, new elements | Maintenance |
| Check V-belt tension and pulley alignment | Deflection 10–15 mm per 1 m of span, measured at mid-span; pulleys within 1 mm | Rule, straight edge | Maintenance |
| Grease fan bearings | Two strokes of lithium EP2; purge old grease | Grease gun | Maintenance |
| Clean UV scanner and ignition electrodes | Glass clear, gap 2.5–3.5 mm, insulator uncracked | Soft cloth, feeler gauge | Burner technician |
| Soap-test gas train joints | No bubble growth at any joint or diaphragm vent | Leak detection fluid | Maintenance |
| Exercise dilution damper and linkage | Full stroke in 90 s; actuator arm tight; fail-open on power loss | HMI command, watch blade | Instrument technician |
| Inspect refractory for cracks and spalling (LRF) | Cracks ≤ 3 mm acceptable; larger to be patched | Visual, crack gauge | Refractory crew |
6.3 Quarterly / semi-annual
| Task | What to check / acceptance | Tool or reference | Who |
|---|---|---|---|
| Clean the air-to-air exchanger tubes | Stack temperature back within 20 °C of baseline; no visible ash bridging | Compressed air 0.4 MPa, nylon brush | Maintenance |
| Clean fan impeller, check balance | Vibration ≤ 4.5 mm/s RMS after cleaning; balance grade G6.3 | Vibration meter, ISO vibration severity limits | Maintenance |
| Test high-limit thermostat with heat source | Trips at setpoint + 20 °C, ± 3 °C; burner stops, damper opens | Heat gun, thermometer | Instrument technician |
| Test the airflow proving switch | Trips at 70% of design differential pressure, within 5 s | Test tee, manometer | Instrument technician |
| Measure CO and NOx at outlet (direct-fired food drying) | CO ≤ 50 ppm, NOx ≤ 75 ppm at 3% O2 | Certified analyser | Service engineer |
| Inspect duct insulation and cladding | Surface ≤ 60 °C; no crushed or missing sections | Infrared camera | Maintenance |
| Check expansion gaps at the hot tubesheet | Gap within 2 mm of the calculated 10 mm per 3 m at 280 K rise | Feeler gauge, drawing | Service engineer |
6.4 Annual shutdown inspection
| Task | What to check / acceptance | Tool or reference | Who |
|---|---|---|---|
| Inspect and pressure-test the exchanger bundle | No through-leak; flue CO₂ in process air below 0.2% on WRF | Pneumatic test 1.5 × casing pressure, CO₂ meter | Service engineer |
| Full refractory survey and repair (LRF) | Lining thickness ≥ 85% of drawing; no exposed anchors | Hammer tap, depth probe | Refractory crew |
| Dry out repaired refractory | 150 °C for 6 h, then 25 K/h to 600 °C, hold 4 h | Dry-out curve, thermocouples | Commissioning engineer |
| Replace fan bearings and check alignment | Shaft alignment within 0.05 mm; no axial preload | Dial gauge, laser aligner | Maintenance |
| Overhaul gas train, prove valve tightness | Internal leak test: no pressure rise in 60 s on either valve | Valve proving record | Burner technician |
| Re-test duct leakage | ≤ 2% of design flow at 1.5 × working static | Blower door, manometer | Maintenance |
| Test every interlock in Section 4 | All eight interlocks pass; signed sheet filed | Interlock test sheet | Instrument technician |
| Certify final filters, HEPA stage on WRF | H13 integrity test pass, ≤ 0.01% penetration | Particle counter, DOP test | Cleanroom contractor |
7. Troubleshooting
| Symptom | Likely cause | Check | Remedy |
|---|---|---|---|
| Outlet temperature below setpoint with the damper closed | Capacity limit or fouled exchanger | Stack temperature and fuel rate vs baseline | Clean the bundle; reduce dryer load or add dilution capacity |
| Outlet temperature oscillates ± 15 °C | PID too aggressive, or sensor in a dead zone | Damper and sensor trend | Retune to 60 s settling; centre the sensor in the duct |
| Burner locks out at ignition | Purge incomplete, weak spark, or low gas pressure | Purge timer, electrode gap, inlet pressure | Reset purge, set the gap to 3 mm, restore pressure |
| Flame established then lost | Dirty UV scanner, or flame lifted by over-draught | Scanner window, flue draught at low rate | Clean the scanner; fit a draught stabiliser |
| High stack temperature, normal outlet | Fouled tubes or baffle damage | Stack vs baseline, tube inspection | Clean the tubes, replace damaged baffles |
| Smoke or CO at the outlet (direct-fired) | Rich mixture, or combustion products leaking into process air | O2 and CO at the outlet; casing joints | Trim excess air to 4% O2; seal the casing and re-test CO |
| Fan vibration above 4.5 mm/s | Dirt on the impeller, worn bearing, or belt misalignment | Vibration spectrum, bearing temperature | Clean and rebalance; replace bearings; realign pulleys |
| Ash carry-over into the exchanger (LRF) | Excess grate speed or low secondary air | Grate speed, secondary air, ash bed | Reduce feed, raise secondary air, reset the grate |
| Refractory glowing or hot casing spot | Cracked castable or failed anchor | Infrared scan, tap test | Shut down, patch or re-cast, dry out per Section 6.4 |
8. Spare parts and service
Hold these first-year spares on site; double them where two units share a duty.
| Item | Quantity | Notes |
|---|---|---|
| Intake and final filter elements | 2 sets | Match the drawing frame size |
| V-belt set | 2 sets | Replace as a matched set |
| Fan bearings | 1 set per fan | Grease and seals included |
| UV scanner and ignition electrode | 1 each | Consumable, keep one spare |
| Flame safeguard relay | 1 | Same part number as fitted |
| High-limit thermostat | 1 | Set to drawing value before fitting |
| Airflow proving switch | 1 | Check set point after fitting |
| Refractory castable | 200 kg | Same grade as original lining |
| Grate bars and ash door gasket (LRF) | 10 bars, 2 gaskets | Fast-wearing items |
| Gas train solenoid coils | 1 pair | Match the valve class |
| Dilution damper actuator | 1 | Fail-open type, 90 s stroke |
Consumables: lithium EP2 grease, leak detection fluid, filter media, patching mortar and heat-transfer paste. Order by model, serial and drawing number, all on the nameplate and the matched burner and gas train data sheet; a control cabinet order also needs the cabinet serial. We acknowledge within one working day, diagnose remotely within two, and attend site within five working days in mainland China, by arrangement elsewhere. Book service through the contact page.
9. Document control
| Rev | Date | Change |
|---|---|---|
| 1.0 | 2026-11 | First issue for LRF, ZRFQ and WRF families |
This file is hash-verified. The published PDF’s SHA-256 is recorded in the site manifest at build time and shown on the verification page. Compare it with the hash on your copy; if they differ, the file is altered or superseded and the current revision requested. Henan Yongxing Special Equipment Co., Ltd. keeps the master under revision control.
This manual is generic to the family. For the version written against your unit — burner curve, duct layout, refractory drawing and serial settings — send the model and serial number through the contact page.
Document control and download
Document
YX-MAN-HTA · revision 1.0 · issued 2026-11
Applies to the model families listed in section 1.
Download
Manual PDF · 258 KB
Print-ready A4, same content as this page.
Weekly maintenance log sheet · one page for the shift file.
SHA-256 f0106f1024474efcbcb34525932c940d08976fbf2aa9df215f27c8dcd0cb6d27
This fingerprint is calculated from the PDF file itself. Verify it on the verification page — the check runs in your browser, so an altered file cannot pass. A signed copy of the full manifest is published alongside it.
Key facts
- YXBOILER is the global brand and manufacturing site of Henan Yongxing Boiler Manufacturing Co., Ltd., an industrial boiler and pressure-vessel manufacturer founded in 1981 in Henan, China.
- Main products: steam boilers, hot-water boilers, thermal-oil heaters, biomass and coal-fired boilers, electric boilers, pressure vessels and autoclaves.
- Serving customers in worldwide with selection, drawings, export packaging, installation guidance and spare parts.
- Contact: WhatsApp +86 133 5377 2661 · [email protected].
Related on this site
Specifications, categories and further reading.
- About the company
- Contact & quotation
- Frequently asked questions
- Industrial boiler rangeSteam, hot-water, thermal-oil and biomass boilers.
YXBOILER network
The same manufacturer, documented site by site.
- YXBOILER product catalogueDetailed specifications and model pages for every boiler and pressure vessel.
- Yongxing Boilers — news & official updatesCorporate news, exhibitions, case studies and company announcements.
- YXBOILER IndonesiaBoiler supply, installation and service for Indonesian plants.
- Boiler MalaysiaIndustrial boiler supply and after-sales service in Malaysia.
- Boiler PhilippinesIndustrial boiler supply and after-sales service in the Philippines.
Standards & references
Independent sources used in our engineering work.
- ASME Boiler and Pressure Vessel CodeThe international reference code for boiler and pressure-vessel design and fabrication.
- ISO 9001 quality managementThe quality-management standard our manufacturing system is certified against.
- Spirax Sarco — learn about steamIndependent engineering reference for steam, condensate and heat-transfer practice.
- Boiler — WikipediaBackground on boiler types, fuels and thermodynamic principles.
YXBOILER — Global brand and manufacturing site. Last updated November 2026.